Organization
Locations
News Room
Products & Services
Quality Program
Careers
Westinghouse


Westinghouse Home | PaR Nuclear Home | Contact Us
  search button
Transfer System

The transfer system transports fuel between the reactor building and the spent fuel pool in most PWR plants and some BWR plants. PaR Nuclear’s standard upender design uses a hydraulic center pivot upender to transition the fuel between horizontal and vertical positions. PaR Nuclear also supports cable-driven end pivot designs.

Safety
  • Interlocks interact with other elements of the Fuel-handling System to ensure the correct sequential process

  • Load weighing system prevents transfer cart hang-ups by detecting overload and underload conditions

  • Initiation of transfer system from refueling machine console reduces need for independent control of the Transfer System

Reliability
  • Latest hydraulic upender design successfully avoids valve leakage

  • Redundant components reduce downtime in the event of a single-component failure
Efficiency
  • FuelNet™ Controls

  • Operation of equipment in automatic, semi-automatic and manual modes allows for appropriate operational mode for a given move

  • Automatic controls optimize fuel movement rate

  • Fuel-sequencing database file generates moves with minimal operator intervention

  • High-speed cart and upender designs reduce time to move fuel


Transfer System Hydraulic Center Pivot Upender